CASB Report for October, 1999

Highlights for Division Meeting

Community Affairs and Communications

Project Management and Technical Infrastructure

 

MISSION SUPPORT

HST Operations

STIS-BOP

 

DIGITIZED SKY SURVEY

Plate Scanning

 

GAMMA Microdensitometer Systems

Data Compression/CD Production

Archive Maintenance

Software Development

GSC-II

Recalibration/production planning

Plate Processing at ECF and STScI

COMPASS Database

CALIBRATIONS: Astrometry

CALIBRATIONS: Classification

CALIBRATIONS: Photometry (GSPC-II and DSS-I and -II)

GSC-II General Software Development

GSC-II Science

 

 

 

Appendix – CASB Statistical Summary

SCANNING

Survey

Goal

Previous Month

Current Month

Current Total

% done

Notes

Priority

POSS-II J

897

898

0

898

100

 

1

POSS-II F

897

907

0

907

100

S4

1

POSS-II N

897

787

0

787

88

 

1

AAO-SES

606

597

0

597

99

 

1

PPARC-ER

288

252

0

252

88

 

1

AAO-SR

118

118

0

118

100

S2

-

UKST-IR

894

193

36

229

26

 

2

SERC-J/EJ

447

413

30

443

99

S1

2

POSS-I E

106

106

0

106

100

S3

3

POSS-I O

880

7

21

28

2

 

3

Rescans

 

18

0

18

     

S1. Low priority program to rescan crowded fields (|b|<30) originally done with 25 mu scans. The total number of S scans includes the 2 for the LMC and SMC plus 4 others with |b|>30 performed for research or STIS BOP support. Another 30 plates have been added to replace those that were repaired before inclusion

in DSS-I.

S2. This survey is an on-going low level-of-effort collaboration between the ST ScI and the AAO. About 25-50 plates have been added in each of the past few years.

S3. Low priority scans of the POSS-I -24 deg and -30 deg zones.

S4. Includes recent scans of better grade plates.

COMPRESSION

Survey

Goal

Previous Month

Current Month

Current Total

% done

Notes

Priority

POSS-II J

897

893

0

893

99

 

2

POSS-II F

897

877

0

877

98

 

1

POSS-II N

897

0

0

0

0

 

3

AAO SES

606

572

0

572

94

 

1

PPARC ER

288

245

0

245

85

 

1

UKST-IR

894

0

0

0

0

 

3

MO DISK ARCHIVING

Survey

Goal

Previous Month

Current Month

Current Total

% done

Notes

Priority

POSS-II J

897

902

0

902

100

 

4

POSS-II F

897

868

10

878

98

 

3

POSS-II N

897

14

0

14

2

 

4

AAO-SES

606

396

66

462

76

 

3

PPARC-ER

288

126

0

126

49

 

3

AAO-SR

109

0

0

0

0

 

4

UKST-IR

894

0

0

0

0

 

5

SERC-J/EJ

894

892

0

892

100

 

-

POSS-I E

880

821

7

828

94

 

2

POSS-I REPAIR

198

198

0

198

100

2

POSS-QV

613

613

0

613

100

 

-

SERC-QV

94

94

0

94

100

 

-

GPO/BB

88

88

0

88

100

 

-

GSC-II PLATE PROCESSING

Survey

Goal

Previous Month

Current Month

Current Total

% done

Notes

Priority

POSS-I E

880

66

0

66

2

 

3

POSS-QV

613

0

0

0

0

 

3

POSS-II J

897

887

0

887

99

 

1

POSS-II F

897

889

8

897

100

 

1

POSS-II N

897

41

0

41

5

 

4

SERC-J/EJ

894

795

27

822

92

 

1

South-F

894

797

18

815

91

 

1

UKST-IR

894

2

0

2

0

 

4

South-SR

118

102

8

110

93

 

2

South-QV

94

94

0

94

100

 

2

GSC-II COMPASS DATABASE LOAD (total number entries = 842616131)

Survey

Goal

Previous Month

Current Month

Current Total

% done

Notes

Priority

POSS-I E

880

0

0

0

0

 

3

POSS-QV

613

0

0

0

0

 

3

POSS-II J

897

382

27

409

46

 

1

POSS-II F

897

613

72

685

76

 

1

POSS-II N

897

0

0

0

0

 

4

SERC-J

894

38

1

39

4

 

1

South-F

894

447

12

459

51

 

1

UKST-IR

894

0

0

0

0

 

4

South-SR

109

13

0

13

12

 

2

South-QV

94

13

0

13

14

 

2

GSC-II Dataset for V2.0 delivery (117 Fields)

Item

Count

% done

Notes

Plates available

232/234

99

 

Plate processed

232

99

 

DB Load

217

92

 

Photometric Calib

224

96

 

Astrometric Calib

224

96

 

Reclassification

0

0

 

GSPC-II OBSERVATIONS

Survey

Goal

Previous Month

Current Month

Current Total

% done

Notes

Priority

POSS-I

584

578

0

578

99

 

1

POSS-II

295

144

0

144

49

 

1

SERC

894

873

0

873

98

 

1

GSPC-II REDUCTIONS

Survey

Goal

Previous Month

Current Month

Current Total

% done

Notes

Priority

POSS-I

584

578

0

578

99

P1

1

POSS-II

295

144

0

144

49

 

1

SERC

894

873

0

873

98

 

1

               

P1. The current total has decreased because these numbers reflect re-processed data.