CASB Report for December, 1999

 

Highlights for Division Meeting

·         Improvements to pipeline procedures plus use of the vastly improved GSPC-II have resulted in the extremely high rates of photometric recalibration of plates already in COMPASS.

·         GSC 2.1.0 data delivery in progress

 

Community Affairs and Communications

 

Project Management and Technical Infrastructure

 

 

MISSION SUPPORT

HST Operations

·         No new GSPRs (Guide Star Problem Reports) were received this period. 

 

STIS-BOP

·         Completed generating STIS-BOP year 2000 moving-target charts for Jupiter and Saturn. Successfully used the new software to extract the necessary images from the compressed archive for this purpose.

·         Completed the recalibration of the above 18 STIS-BOP fields using the latest GSPC-II.  This resulted in vastly improved photometry for the objects contained in these fields.

·         Continued investigating the requirements for the STIS Bright Object Protection GUI that will be used by the Contact Scientists when performing the BOP processing of programs.

 

NGST Guiding Studies

 

DIGITIZED SKY SURVEY

Plate Scanning

·         Continued scanning the sixth shipment of UKST-IR plates.  Production was low due to continuing problems with GAMMA2.

·         Unpacked a large shipment of plates from ROE.  The shipment contains more UKST-IR plates plus southern F plates needed to complete GSC-II.

·         Sent a shipment of tapes to Cal Tech, including a number of remakes for old tapes that have become unreadable.

 

GAMMA Microdensitometer Systems

·         GAMMA2 continues to produce unacceptable amounts of shearing between adjacent multichannel passes.   Performed the planned sequence of engineering scans using grated rulings and subsequent analysis of this data.

·         Re-did the setup on GAMMA2 because both the setup and results of the ruling scans were poor. Initial analysis of the new setup verifies the shear analysis result of unacceptable inter- pass shear.  The ruling scans show a slight difference in the y pixel size derived from the interline data vs. the y pixel size derived from inter pass data.  Corrections for this problem involve either (or both) adjustments to the frequency step size or small adjustments to the beam deflection angle.  Both corrections must be empirically determined from additional ruling scans.  These new scans are currently being performed.

·         Damping adjustments were performed on GAMMA1 resulting in improved performance of the servos.

 

Data Compression/CD Production

·         Awaiting the receipt, scanning, and compressing of the final plate from Palomar before the last four J plates can be archived.

·         Completed analysis of compression methods for the POSSII-N survey. Completed the first four CDROMs of compressed scans for this survey.

 

Archive Maintenance

·         Of 38 POSS-I E scans retrieved for archiving to MOD, four have failed checksums on the rollback.  This phenomenon is unexplained. For now, we are postponing the archiving of the problem scans and may rescan the plates, if necessary.

·         Continued to perform QA and maintenance of the DID and GSH file sanctuaries at a low level of effort. Identified and corrected a small number of anomalous files.

 

Software Development

·         No progress reported in investigation of a GETIMAGE failure with the DSS-I, first reported by the NAOJ Astronomical Data Analysis Center.

 

GSC-II

Plate Processing at STScI

·         Continued recalibration of plates currently in the COMPASS database.  Nearly 1000 of the plates in COMPASS have been recalibrated using the newest GSPC-II catalog.  The calibrations for individual plates look very good over a large range in brightness (8th or 9th magnitude to 19th to 20th magnitude).

·         Improvements to the pipeline procedures along with the vastly improved GSPC-II have resulted in the extremely high production rates - over 800 plates recalibrated in December to date!  The new calibrations, performed on VMS, will need to be applied to the COMPASS data.  This should begin early in the New Year.

·         Analyzed the DID and GSH files from a set of over 2000 processed plates from various surveys. Created IDL utilities to overplot subsets of data and identify the plates associated with outlying points. Continued to enhance the analysis software provided by OATo staff to include additional keywords from the DID and GSH files.

 

COMPASS Database

·         The HSM system is reaching online disk capacity and while this system is fully operational, there are ongoing conflicts with file migration performing concurrently with COMPASS production tasks.  These technical issues are normal for large-scale storage systems and we are continuing to develop configuration strategies for expanding the online capacity.

·         COMPASS production object matching has completed processing of 804 plates.

·         The year-end delivery for GEMINI will proceed over the next week with the export of the GSC-2 catalog from COMPASS.

·         Software development for COMPASS population with external reference catalogs is progressing with GSPC-2.

 

CALIBRATIONS: Astrometry

 

CALIBRATIONS: Classification

 

CALIBRATIONS: Photometry (GSPC-II and DSS-I and -II)

 

GSC-II General Software Development

·         Identified and corrected a minor bug in the HEADERSOL task introduced by a change in calling sequence of one of the subroutines it calls.

·         Provided a copy of the latest GSPC2 and associated software to OATo staff.

 

GSC-II Science

·         Proper motions have been derived for a million stars in a 3 x 4 degree region around the open cluster IC 2602.  No cluster stands out from the field population in the vector point diagram, but cluster members taken from literature are being matched to the GSC2 results to find the cluster proper motion in the vector point diagram.

 

 


 

Appendix – CASB Statistical Summary

 

SCANNING                                                                                                                                                                         

Survey

Goal

Previous Month

Current Month

Current Total

% done

Notes

Priority

POSS-II J

897

898

0

898

   100 

 

1

POSS-II F

897

907

0

907

100

         S4

1

POSS-II N

897

787

0

787

88

 

1

AAO-SES

606

597

5

602

99

 

1

PPARC-ER

288

252

0

252

88

 

1

AAO-SR

118

118

0

118

100

S2

-

UKST-IR

894

263

9

272

30

 

2

SERC-J/EJ

447

443

0

443

99

      S1

           2

POSS-I E

106

106

0

106

     100

        S3

           3

POSS-I O

880

28

2

30

3

 

3

Rescans

 

18

0

18

 

 

 

 

·         S1. Low priority program to rescan crowded fields (|b|<30) originally done with 25 micron scans.  The total number of S scans includes the 2 for the LMC and SMC plus 4 others with |b|>30 performed for research or STIS BOP support.  Another 30 plates have been added to replace those that were repaired before inclusion in DSS-I.

·         S2. This survey is an on-going low level-of-effort collaboration between the STScI and the AAO. About 25-50 plates have been added in each of the past few years.

·         S3. Low priority scans of the POSS-I -24 deg and -30 deg zones.

·         S4. Includes recent scans of better grade plates.

 

COMPRESSION

Survey

Goal

Previous Month

Current Month

Current Total

% done

Notes

Priority

POSS-II J

897

893

0

893

99

 

           2

POSS-II F

897

877

0

877

98

 

1

POSS-II N

897

4

21

25

3

 

3

AAO SES

606

572

0

572

94

 

1

PPARC ER

288

245

0

245

85

 

1

UKST-IR

894

0

0

0

0

 

3

 

MO DISK ARCHIVING       

Survey           

Goal

Previous Month

Current Month

Current Total

% done

Notes

Priority

POSS-II J

897

902

0

902

100

 

4

POSS-II F

897

878

0

878

98

 

3

POSS-II N

897

14

46

60

6

 

           4

AAO-SES

606

576

0

576

95

 

3

PPARC-ER

288

126

0

126

49

 

3

AAO-SR

109

0

0

0

0

 

4

UKST-IR

894

0

0

0

0

 

5

SERC-J/EJ

894

892

0

892

100

 

 

SERC-J/REPAIR

48

33

15

48

100

 

 

POSS-I E

933

876

52

928

99

 

2

POSS-I REPAIR

198

198

0

198

100

 

2

POSS-QV

613

613

0

613

100

 

-

SERC-QV

94

94

0

94

100

 

-

GPO/BB

88

88

0

88

100

 

-

 

GSC-II PLATE PROCESSING

Survey

Goal

Previous Month

Current Month

Current Total

% done

Notes

Priority

POSS-I E

880

66

0

66

2

 

3

POSS-QV

613

0

0

0

0

 

3

POSS-II J

897

887

0

887

99

G1

1

POSS-II F

897

897

0

897

100

 

1

POSS-II N

897

41

0

41

5

 

4

SERC-J/EJ 

     894

822

0

822

92

 

1

South-F

894

815

0

815

91

 

1

UKST-IR

894

2

0

2

0

 

4

South-SR

118

110

0

110

93

 

2

South-QV

94

94

0

94

100

 

2

 

G1. Plate processing is nearly complete.  Efforts are now concentrated on recalibration and

       Database load.

 

GSC-II COMPASS DATABASE LOAD (total number entries = 954731259)

Survey

Goal

Previous Month

Current Month

Current Total

% done

Notes

Priority

POSS-I E

880

0

0

0

0

 

3

POSS-QV

613

0

0

0

0

 

3

POSS-II J

897

436

5

441

49

 

1

POSS-II F

897

721

7

728

81

 

1

POSS-II N

897

0

0

0

0

 

4

SERC-J

894

105

15

120

13

 

1

South-F

894

461

0

461

51

 

1

UKST-IR

894

0

0

0

0

 

4

South-SR

109

13

0

     13

    12

 

2

South-QV

94

13

0

13

14

 

2

 

GSC-II Dataset for V2.1 delivery (1791 Fields,  3438 plates)   (P1)

Item

Count

% done

Notes

Plates available

3409

99

 

Plates processed

3355

98

 

DB Load

1726

50

 

Recalibration

839

24

 

 

P1. Defined as all 897 POSS fields with 1794 plates plus 894 southern fields minus the 72

      southern equatorial fields with 1644 plates.

 

GSPC-II OBSERVATIONS

Survey

Goal

Previous Month

Current Month

Current Total

% done

Notes

Priority

POSS-I

584

578

0

578

99

 

1

POSS-II

295

144

0

144

49

 

1

SERC

894

873

0

873

98

 

1

 

GSPC-II REDUCTIONS

Survey

Goal

Previous Month

Current Month

Current Total

% done

Notes

Priority

POSS-I

584

578

0

578

99

P1

1

POSS-II

295

144

0

144

49

 

1

SERC

894

873

0

873

98

 

1

P1.  The current total has decreased because these numbers reflect re-processed data.