CASB Report for March, 1999

Community Affairs and Communications

Project Management and Technical Infrastructure
MISSION SUPPORT

HST Operations

STIS-BOP NGST Studies

DIGITIZED SKY SURVEY

Plate Scanning

GAMMA Microdensitometer Systems Data Compression/CD Production Archive Maintenance

Software Development

GSC-II

Plate Processing at ECF and STScI

COMPASS Database CALIBRATIONS: Astrometry

CALIBRATIONS: Classification

CALIBRATIONS: Photometry (GSPC-II and DSS-I and -II) GSC-II Science

Appendix – CASB Statistical Summary

SCANNING
 
Survey Goal Previous Month Current Month Current Total % done Notes Priority
POSS-II J
897
895
1
896
99.9
 
1
POSS-II F
897
881
7
888 99  
1
POSS-II N
897
723
30
753
84
 
1
AAO-SES
606
587
0
587
97
 
1
PPARC-ER
288
252
0
252
88
 
1
AAO-SR
109
109
0
109
100
S2
-
UKST-IR
894
50
8
58
6
 
2
SERC-J/EJ
447
413
0
413
92
S1
2
POSS-I E
112
74
11
85
76
S3
3
POSS-I O
880
0
4
4
5
 
3

S1. Low priority program to rescan crowded fields (|b|<30) originally done with 25 mu scans. The total number of S scans includes the 2 for the LMC and SMC plus 4 others with |b|>30 performed for research or STIS BOP support.

S2. This survey is an on-going low level-of-effort collaboration between the ST ScI and the AAO. About 25-50 plates have been added in each of the past few years.

S3. Low priority scans of the POSS-I -24 deg and -30 deg zones.
 
 

COMPRESSION
 
Survey Goal Previous Month Current Month Current Total % done Notes Priority
POSS-II J
897
687
64
751
84
 
2
POSS-II F
897
868
0
868
97
 
1
POSS-II N
897
0
0
0
0
 
3
AAO SES
606
572
0
572
94
 
1
PPARC ER
288
245
0
245
85
 
1
UKST-IR
894
0
0
0
0
 
3

MO DISK ARCHIVING
 
Survey Goal Previous Month Current Month Current Total % done Notes Priority
POSS-II J
897
740
41
781
87
 
4
POSS-II F
897
460
156
616
69
 
3
POSS-II N
897
0
4
4
4
1
4
AAO-SES
606
245
0
245
40
 
3
PPARC-ER
288
127
0
127
49
 
3
AAO-SR
109
0
0
0
0
 
4
UKST-IR
894
0
0
0
0
 
5
SERC-J/EJ
894
892
0
892
100
 
-
POSS-I E
880
835
0
835
95
 
2
POSS-QV
613
613
0
613
100
 
-
SERC-QV
94
94
0
94
100
 
-
GPO/BB
88
88
0
88
100
 
-

 
 
 
 
 
 
 
 
 

GSC-II PLATE PROCESSING
 
Survey Goal Previous Month Current Month Current Total % done Notes Priority
POSS-I E
880
0
66
66
2
 
3
POSS-QV
613
0
0
0
0
 
3
POSS-II J
897
752
17
769
86
 
1
POSS-II F
897
775
33
808
90
 
1
POSS-II N
897
0
0
0
0
 
4
SERC-J
894
512
114
626
70
 
1
South-F
894
659
29
688
77
 
1
UKST-IR
894
0
0
0
0
 
4
South-SR
109
14
0
14
13
 
2
South-QV
94
13
0
13
14
 
2

GSC-II COMPASS DATABASE LOAD
 
Survey Goal Previous Month Current Month Current Total % done Notes Priority
POSS-I E
880
0
0
0
0
 
3
POSS-QV
613
0
0
0
0
 
3
POSS-II J
897
351
0
351
39
 
1
POSS-II F
897
605
0
605
67
 
1
POSS-II N
897
0
0
0
0
 
4
SERC-J
894
0
0
0
0
 
1
South-F
894
436
0
436
49
 
1
UKST-IR
894
0
0
0
0
 
4
South-SR
109
5
0
5
5  
2
South-QV
94
0
0
0
0
 
2

GSC-II Dataset for V2.0 delivery (117 Fields)
 
Item Count % done Notes
Plates available
230/234
97
 
Plate processed
226
95
 
DB Load
131
56
 
Photometric Calib
157
67
 
Astrometric Calib
0
0
 
Reclassification
0
0
 

GSPC-II OBSERVATIONS
 
Survey Goal Previous Month Current Month Current Total % done Notes Priority
POSS-I
584
565
4
569
97
 
1
POSS-II
142
109
28
137
96
 
1
SERC
894
891
0
891
99
 
1

GSPC-II REDUCTIONS
 
Survey Goal Previous Month Current Month Current Total % done Notes Priority
POSS-I
584
563
0
563
96
 
1
POSS-II
142
109
28
137
96
 
1
SERC
894
654
103
757
85
 
1