CASB Report for August, 1999
Highlights for Division Meeting
Community Affairs and Communications
Project Management and Technical Infrastructure
MISSION SUPPORT
HST Operations
STIS-BOP
DIGITIZED SKY SURVEY
Plate Scanning
GAMMA Microdensitometer Systems
Data Compression/CD Production
Archive Maintenance
Software Development
GSC-II
Plate Processing at ECF and STScI
COMPASS Database
CALIBRATIONS: Astrometry
CALIBRATIONS: Classification
CALIBRATIONS: Photometry (GSPC-II and DSS-I and -II)
GSC-II General Software Development
GSC-II Science
Appendix – CASB Statistical Summary
SCANNING
Survey |
Goal |
Previous Month |
Current Month |
Current Total |
% done |
Notes |
Priority |
|
POSS-II J |
897 |
898 |
0 |
898 |
100 |
1 |
||
POSS-II F |
897 |
907 |
0 |
907 |
100 |
S4 |
1 |
|
POSS-II N |
897 |
779 |
8 |
787 |
88 |
1 |
||
AAO-SES |
606 |
597 |
0 |
597 |
99 |
1 |
||
PPARC-ER |
288 |
252 |
0 |
252 |
88 |
1 |
||
AAO-SR |
118 |
112 |
6 |
118 |
100 |
S2 |
- |
|
UKST-IR |
894 |
170 |
23 |
193 |
22 |
2 |
||
SERC-J/EJ |
447 |
413 |
0 |
413 |
94 |
S1 |
2 |
|
POSS-I E |
106 |
85 |
21 |
106 |
100 |
S3 |
3 |
|
POSS-I O |
880 |
4 |
1 |
5 |
1 |
3 |
||
Rescans |
10 |
8 |
18 |
S1. Low priority program to rescan crowded fields (|b|<30) originally done with 25 mu scans. The total number of S scans includes the 2 for the LMC and SMC plus 4 others with |b|>30 performed for research or STIS BOP support.
S2. This survey is an on-going low level-of-effort collaboration between the ST ScI and the AAO. About 25-50 plates have been added in each of the past few years.
S3. Low priority scans of the POSS-I -24 deg and -30 deg zones.
S4. Includes recent scans of better grade plates.
COMPRESSION
Survey |
Goal |
Previous Month |
Current Month |
Current Total |
% done |
Notes |
Priority |
POSS-II J |
897 |
850 |
43 |
893 |
99 |
2 |
|
POSS-II F |
897 |
868 |
9 |
877 |
98 |
1 |
|
POSS-II N |
897 |
0 |
0 |
0 |
0 |
3 |
|
AAO SES |
606 |
572 |
0 |
572 |
94 |
1 |
|
PPARC ER |
288 |
245 |
0 |
245 |
85 |
1 |
|
UKST-IR |
894 |
0 |
0 |
0 |
0 |
3 |
MO DISK ARCHIVING
Survey |
Goal |
Previous Month |
Current Month |
Current Total |
% done |
Notes |
Priority |
POSS-II J |
897 |
889 |
13 |
902 |
100 |
4 |
|
POSS-II F |
897 |
854 |
14 |
868 |
97 |
3 |
|
POSS-II N |
897 |
4 |
10 |
14 |
2 |
4 |
|
AAO-SES |
606 |
245 |
117 |
362 |
60 |
3 |
|
PPARC-ER |
288 |
127 |
0 |
127 |
49 |
3 |
|
AAO-SR |
109 |
0 |
0 |
0 |
0 |
4 |
|
UKST-IR |
894 |
0 |
0 |
0 |
0 |
5 |
|
SERC-J/EJ |
894 |
892 |
0 |
892 |
100 |
- |
|
POSS-I E |
880 |
821 |
0 |
821 |
93 |
2 |
|
POSS-I REPAIR |
199 |
199 |
0 |
199 |
100 |
|
2 |
POSS-QV |
613 |
613 |
0 |
613 |
100 |
- |
|
SERC-QV |
94 |
94 |
0 |
94 |
100 |
- |
|
GPO/BB |
88 |
88 |
0 |
88 |
100 |
- |
GSC-II PLATE PROCESSING
Survey |
Goal |
Previous Month |
Current Month |
Current Total |
% done |
Notes |
Priority |
POSS-I E |
880 |
66 |
0 |
66 |
2 |
3 |
|
POSS-QV |
613 |
0 |
0 |
0 |
0 |
3 |
|
POSS-II J |
897 |
862 |
1 |
863 |
96 |
1 |
|
POSS-II F |
897 |
886 |
1 |
887 |
99 |
1 |
|
POSS-II N |
897 |
0 |
41 |
41 |
5 |
4 |
|
SERC-J/EJ |
894 |
702 |
25 |
727 |
81 |
1 |
|
South-F |
894 |
820 |
15 |
835 |
93 |
1 |
|
UKST-IR |
894 |
2 |
0 |
2 |
0 |
4 |
|
South-SR |
109 |
79 |
3 |
82 |
75 |
2 |
|
South-QV |
94 |
94 |
0 |
94 |
100 |
2 |
GSC-II COMPASS DATABASE LOAD
(total number entries = 758,880,625)
Survey |
Goal |
Previous Month |
Current Month |
Current Total |
% done |
Notes |
Priority |
POSS-I E |
880 |
0 |
0 |
0 |
0 |
3 |
|
POSS-QV |
613 |
0 |
0 |
0 |
0 |
3 |
|
POSS-II J |
897 |
377 |
5 |
382 |
43 |
1 |
|
POSS-II F |
897 |
612 |
1 |
613 |
68 |
1 |
|
POSS-II N |
897 |
0 |
0 |
0 |
0 |
4 |
|
SERC-J |
894 |
35 |
3 |
38 |
4 |
1 |
|
South-F |
894 |
444 |
3 |
447 |
50 |
1 |
|
UKST-IR |
894 |
0 |
0 |
0 |
0 |
4 |
|
South-SR |
109 |
13 |
0 |
13 |
12 |
2 |
|
South-QV |
94 |
0 |
13 |
13 |
14 |
2 |
GSC-II Dataset for V2.0 delivery (117 Fields)
Item |
Count |
% done |
Notes |
Plates available |
232/234 |
99 |
|
Plate processed |
232 |
99 |
|
DB Load |
217 |
92 |
|
Photometric Calib |
224 |
96 |
|
Astrometric Calib |
224 |
96 |
|
Reclassification |
0 |
0 |
GSPC-II OBSERVATIONS
Survey |
Goal |
Previous Month |
Current Month |
Current Total |
% done |
Notes |
Priority |
POSS-I |
584 |
569 |
9 |
578 |
99 |
1 |
|
POSS-II |
295 |
137 |
7 |
144 |
49 |
1 |
|
SERC |
894 |
873 |
0 |
873 |
98 |
1 |
GSPC-II REDUCTIONS
Survey |
Goal |
Previous Month |
Current Month |
Current Total |
% done |
Notes |
Priority |
POSS-I |
584 |
563 |
-36 |
527 |
90 |
P1 |
1 |
POSS-II |
295 |
137 |
7 |
144 |
49 |
1 |
|
SERC |
894 |
757 |
101 |
858 |
96 |
1 |
P1. The current total has decreased because these numbers reflect re-processed data.